Careers
Careers

job details

Back to jobs search

Jobs search results

2,805 jobs matched
Back to jobs search

Electrical Engineer, Data Center Construction and Design

GoogleSwedenRemote eligible
Note: Google’s hybrid workplace includes remote roles.

Remote location: Sweden.

Minimum qualifications:

  • Bachelor's degree in Electrical, Mechanical, Industrial, or Construction Engineering or equivalent practical experience.
  • 3 years of experience in design development of electrical power distribution and data center infrastructure products.
  • 3 years of experience with Electrical Engineering for construction projects in a Data Center colocation facility.

Preferred qualifications:

  • Experience in managing vendor relationships with an understanding of standard practices in the design and construction industry, including fast-track design build processes and associated documents. Experience in green field construction projects.
  • Experience managing large-scale construction projects within an international working environment.
  • Knowledge of large-scale facility electrical and mechanical systems.
  • Ability to travel up to 20% of the time as needed.

About the job

Our thirst for technology is a part of everything we do. The Data Center Engineering team takes the physical design of our data centers into the future. Our lab mirrors a research and development department -- cutting-edge strategies are born, tested and tested again. Along with a team of great minds, you take on complex topics like how we use power or how to run state-of-the-art, environmentally-friendly facilities. You're a visionary who optimizes for efficiencies and never stops seeking improvements -- even small changes that can make a huge impact. You generate ideas, communicate recommendations to senior-level executives and drive implementation alongside facilities technicians.

The Datacenter Delivery and Engineering (DCDE) team is a collection of CSA & MEP design experts, mechanical engineers, electrical engineers, construction project managers, water/air experts, data center services managers, and project controls managers who schedule, design, and construct the most efficient data centers in the world, at a fast pace and in a scalable manner.

Responsibilities

  • Drive high-complexity electrical project outcomes by managing scope, priorities, and technical resources while integrating feedback from different stakeholders.
  • Act as the lead electrical subject matter expert, providing technical leadership to resolve critical field issues and troubleshooting advanced system events.
  • Develop new processes and methods to solve problems with limited precedent, defining the best approach for project design, scope, and schedule.
  • Ensure project success by contributing to quality, commissioning, and safety plans, leading the technical resolution of snags and onsite engineering issues.
  • Support program managers and coordinate with contractors, vendors, and authorities to ensure projects are delivered safely, on schedule, and within budget.

Information collected and processed as part of your Google Careers profile, and any job applications you choose to submit is subject to Google's Applicant and Candidate Privacy Policy.

Google is proud to be an equal opportunity and affirmative action employer. We are committed to building a workforce that is representative of the users we serve, creating a culture of belonging, and providing an equal employment opportunity regardless of race, creed, color, religion, gender, sexual orientation, gender identity/expression, national origin, disability, age, genetic information, veteran status, marital status, pregnancy or related condition (including breastfeeding), expecting or parents-to-be, criminal histories consistent with legal requirements, or any other basis protected by law. See also Google's EEO Policy, Know your rights: workplace discrimination is illegal, Belonging at Google, and How we hire.

If you have a need that requires accommodation, please let us know by completing our Accommodations for Applicants form.

Google is a global company and, in order to facilitate efficient collaboration and communication globally, English proficiency is a requirement for all roles unless stated otherwise in the job posting.

To all recruitment agencies: Google does not accept agency resumes. Please do not forward resumes to our jobs alias, Google employees, or any other organization location. Google is not responsible for any fees related to unsolicited resumes.

Google apps
Main menu