Careers
Careers

job details

Back to jobs search

Jobs search results

2,681 jobs matched
Back to jobs search

Mechanical Systems Design Verification Lead, Data Center Construction

GoogleNew York, NY, USA

Minimum qualifications:

  • Bachelor's degree in Mechanical or Industrial Engineering, related discipline, or equivalent practical experience.
  • 12 years of experience in mission critical facility design and construction environments.
  • Experience in mechanical infrastructure.

Preferred qualifications:

  • Master’s or PhD degree in Mechanical Engineering or a related technical discipline.
  • 5 years of engineering leadership experience in a large, global organization, focused on technical design verification and program-level issue resolution.
  • Experience in Construction Facilities.
  • Understanding of constructability, commissioning, and operational handover processes for mechanical systems.
  • Experience in critical industrial automation and controls systems design, combined with formal training and an understanding of stack integration and failure modes.
  • Ability to manage the mechanical scope and design adherence to business goals across geographically dispersed portfolio.

About the job

Our thirst for technology is a part of everything we do. The Data Center Engineering team takes the physical design of our data centers into the future. Our lab mirrors a research and development department -- cutting-edge strategies are born, tested and tested again. Along with a team of great minds, you take on complex topics like how we use power or how to run state-of-the-art, environmentally-friendly facilities. You're a visionary who optimizes for efficiencies and never stops seeking improvements -- even small changes that can make a huge impact. You generate ideas, communicate recommendations to senior-level executives and drive implementation alongside facilities technicians.

With your technical expertise, you ensure compliance with codes and standards, develop infrastructure improvements and serve as an expert in your specialty (e.g., cooling, electrical).

This role is critical to the Data Center Construction department, focusing on ensuring the technical integrity and successful delivery of mechanical cooling infrastructure across the global data center portfolio. Reporting to the Distinguished Engineer and the VP responsible for technical design content, you will serve as the final verification authority for the mechanical scope. You are responsible for the accuracy, completeness, and adherence to business goals of the designs proposed by the Data Center Technology and Systems (DCTS) team. This position requires exceptional communication skills to synthesize the needs of field execution, systems architecture, operations, and procurement teams, enabling you to proactively resolve, real-time mechanical system issues across various geographic and project environments.Behind everything our users see online is the architecture built by the Technical Infrastructure team to keep it running. From developing and maintaining our data centers to building the next generation of Google platforms, we make Google's product portfolio possible. We're proud to be our engineers' engineers and love voiding warranties by taking things apart so we can rebuild them. We keep our networks up and running, ensuring our users have the best and fastest experience possible.

The US base salary range for this full-time position is $214,000-$302,000 + bonus + equity + benefits. Our salary ranges are determined by role, level, and location. Within the range, individual pay is determined by work location and additional factors, including job-related skills, experience, and relevant education or training. Your recruiter can share more about the specific salary range for your preferred location during the hiring process.

Please note that the compensation details listed in US role postings reflect the base salary only, and do not include bonus, equity, or benefits. Learn more about benefits at Google.

Responsibilities

  • Collaborate with Operations and Design teams to verify mechanical infrastructure designs from master planning and project conception through to Issued for Construction (IFC) documentation for new data center build-outs and major upgrades.
  • Drive the Research and Development and project insertion of new mechanical technologies, working closely with core engineering teams to ensure designs are scalable, and align with long-term company strategy.
  • Review and validate system-level concepts and schematic designs, progressing through to detailed construction designs, to assure all functional, performance, and business requirements are met.
  • Identify and lead the resolution of global, program-wide mechanical system issues impacting multiple projects, collaborating with cross-functional partners to determine a sustainable path forward and standardize solutions.

Information collected and processed as part of your Google Careers profile, and any job applications you choose to submit is subject to Google's Applicant and Candidate Privacy Policy.

Google is proud to be an equal opportunity and affirmative action employer. We are committed to building a workforce that is representative of the users we serve, creating a culture of belonging, and providing an equal employment opportunity regardless of race, creed, color, religion, gender, sexual orientation, gender identity/expression, national origin, disability, age, genetic information, veteran status, marital status, pregnancy or related condition (including breastfeeding), expecting or parents-to-be, criminal histories consistent with legal requirements, or any other basis protected by law. See also Google's EEO Policy, Know your rights: workplace discrimination is illegal, Belonging at Google, and How we hire.

If you have a need that requires accommodation, please let us know by completing our Accommodations for Applicants form.

Google is a global company and, in order to facilitate efficient collaboration and communication globally, English proficiency is a requirement for all roles unless stated otherwise in the job posting.

To all recruitment agencies: Google does not accept agency resumes. Please do not forward resumes to our jobs alias, Google employees, or any other organization location. Google is not responsible for any fees related to unsolicited resumes.

Google apps
Main menu